Limestone Solar

Union County, Pennsylvania

Located in Limestone Township, in Union County, Pennsylvania, Limestone Solar will provide cost-effective renewable energy to the region.

Our approach to building successful facilities is to work closely with residents in a way that is respectful and fits the needs of the landowners and communities that host us. We seek to build partnerships and bring long-term benefits to where we operate. We prioritize relationship building and open communication and aim to address and incorporate feedback, and further local benefits.

01 /
  • Limestone Solar represents a projected investment of $80 million that will provide widespread direct and indirect job creation and economic benefits.

  • The project will utilize local companies, services, materials, and create jobs.

    60120 construction jobs including equipment operators, electricians, laborers, and others

  • Millions of dollars will be spent locally on lodging, food services, gas, groceries, and other services.

We are involved in community giving throughout the life of our projects. Acting as a good neighbor benefits both the communities where we develop and the long-term success of our facilities. A Community Benefits Program will support the local economy and ensure benefits to the region have a lasting impact through sponsorships and donations.

We place great importance on being active in the communities where we have a presence.

Please let us know if your group would like a presentation or if you have suggestions for sponsorships and local causes we can support.

Limestone Solar is being designed as an 80 MW facility, providing safe, affordable, renewable electricity equal to the needs of more than 55,000 Americans.

Projected Schedule

  • 2023
    Target Full Construction Start

  • 2024
    Target Operations
We share periodic project updates. You may unsubscribe at any time.

Your privacy is important to us, and we will never sell, share, or loan contact information that we collect. Please review our Privacy Policy for more information

"*" indicates required fields

Hidden
This field is for validation purposes and should be left unchanged.

Wind FAQ

How does this project benefit my community?

Wind projects represent millions of dollars of investment that provide widespread direct and indirect job creation and economic benefits, including: lease payments to participating landowners, annual revenue payments to local governments that benefit local schools and community services, local jobs both during construction and operations, increased earnings for local vendors and services, and community giving throughout the life of our projects. We strive to find ways to expand benefits for the landowners and communities where we operate. Acting as a good neighbor benefits both the communities where we develop and the long-term success of our facilities.

How will the project be developed? Will it affect farming and ranching?

Through careful site selection, project design, and use of best management practices during construction and operations, our wind projects are designed to minimize impacts to the natural environment, including wildlife and habitat. Most of the impacts during construction are temporary and will be restored upon completion of construction. Each wind turbine typically requires around one acre of land after construction, allowing landowners to continue farming and ranching around them. We will work with farmers and ranchers when siting wind turbines, access roads, and collection lines to minimize impact to crops, grazing, and other farming and ranching operations.

Are wind facilities safe?

Yes. For more than 40 years people have been living near more than 350,000 wind turbines operating globally and more than 50,000 wind turbines operating in North America. There is no scientific evidence that indicates wind turbines have caused any adverse health effects. Overall, health and medical agencies agree that the sound from wind turbines is not loud enough to cause hearing impairment and is not causally related to adverse effects. Scientific evidence to date indicates that at common residential setback distances there is no direct health risk from wind turbine noise, including low-frequency noise and infrasound. Further, wind turbines do not produce any greenhouse gas emissions, water discharges, or solid waste byproducts.

What is the construction process?

Construction of a wind energy facility typically takes one to two years to complete. During that time, the following activities can be expected: site preparation; building access roads and turbine foundations; delivery and assembly of turbine components; civil work such as grading, excavation and concrete, as well as electrical work and mechanical assembly; and site restoration at the completion of construction

How will the facility be maintained?

We will have a robust annual operations plan and budget to maintain the facility and the land. As a long-term owner and operator of the project, we have a significant interest to maintain the land and the turbines for maximum energy production.

What is the lifespan of a typical wind project?

Modern wind farms are projected to last 30 years, although this can be extended depending on environmental factors and improvements in technology. The project will have a decommissioning plan in place for the facility at the end of its useful life. Turbines and other project infrastructure will be removed, and the site will be restored to its natural state.